Stages

Four rooms,
one grid.

Central Tejo Norte was built to move 220 kV across the river. We kept the wiring and changed the load: four rooms, four rigs, one tempo.

Site opens 19:00 · All rigs L‑Acoustics · 110 dB(A) cap at FOH

Tabs rotate automatically · click to hold a room

01 — Turbine Hall6,000 cap · K2
02 — Cooling Tower1,800 cap · L‑ISA
03 — Switchyard4,000 cap · K1
04 — The Basin2,500 cap · A15
Site map

Follow the cable.

One perimeter, two gates, four rooms. Walking time between the furthest rooms is six minutes along the lit cable trench. Water refill points at every stage; medical at Gate A and the Switchyard.

Rio Tejo → 01 Turbine Hall 6,000 · K2 · stage north wall 02 Cooling Tower 1,800 · L‑ISA 360° 03 Switchyard 4,000 · K1 · lasers on gantries . 04 The Basin 2,500 · floating booth · tidal Gate A Medical · Lockers Gate B Ferry · Taxis Food · Water · Transmission Lounge N
StageWater / towerServicesCable trench (lit path)
110dBFOH cap on every rig · free earplugs at all gates
06minLongest walk between rooms, along the lit trench
04:00Hard curfew · last ferry 04:30 from Gate B
Concrete corridor with symmetrical columns
Turbine Hall · east corridorFig. 03
Factory chimneys over a road at night
Approach from Gate BFig. 04